|
NAILING SCHEDULE
NOFMA Certified Hardwood Flooring Must be installed over a proper subfloor.*
Tongue & Groove Flooring is blind nailed on the Tongue Edge with face nailing required on starting runs (1-2) and finishing runs (2-4).
Square Edge Flooring is face nailed.
Inadequate nailing contributes to cracks and noisy floors by allowing movement of the flooring.
* (Use 1 1/2" fasteners with 3/4" plywood subfloor on a concrete slab. A concrete slab with screeds 12" o.c. does not always require a subfloor.)
|
| SIZE FLOORING |
SIZE NAIL TO BE USED |
SPACING |
3/4" thick T & G
Strip
x 1 1/2", 2 1/4"
through 3 1/4"
Plank
4" - 8"
|
2" barbed flooring cleat,*
7d or 8d flooring nail, or
2" 15 gauge staples with 1/2" crowns*
2" barbed flooring cleat,*
7d or 8d flooring nail, or
2" 15 gauge staples with 1/2" crowns*
|
10" - 12" apart
8" - 10" preferred
8" apart
|
Blind nail along the length of strip/plank and near the ends (1"-3").
Minimum of 2 nails per strip/plank.
(Plank flooring may require face nailing and/or screws for additional fastening)
Follow Manufacturer's Instructions for installation of Plank Flooring.
Widths 4" and over must be installed on a proper subfloor.
|
| SIZE FLOORING |
SIZE NAIL TO BE USED |
SPACING |
1/2" thick T & G STRIP
x 1 1/2" & 2"
3/8" thick T&G STRIP
x 1 1/2" & 2"
|
1 1/2" barbed flooring cleat,
5d screw, cut steel, or wire casing nail
1 1/4" barbed flooring cleat,
4d bright wire casing nail
|
10" apart
8" apart
|
| Must install over proper subfloor |
| SIZE FLOORING |
SIZE NAIL TO BE USED |
SPACING |
5/16" SQUARE-EDGE
(Not Tongue & Grooved)
x 1 1/2" & 2"
x 1 1/3"
|
1" 15 gauge fully barbed flooring brad
1" 15 gauge barbed flooring brad
|
2 nails every 7"
1 nail every 5"
on alternate sides of strip. |
Follow Manufacturer's Instruction for installing Square Edge Flooring.
Must install over a subfloor |
| (Do not mix types of fasteners when blind nailing the field, except near walls where hand nailing is required.) |